Tag Archives: rooftop solar system

Net Metering Facility with Solar

Net Metering Facility with Solar

Net metering facility with solar for grid connected rooftop solar (GCRT Solar) power plant systems of capacity equivalent to the sanctioned load (SL) may be provided by the DISCOM Utility as per the policy and guidelines laid down by Haryana Electricity Regulatory Commission regulations.

What is Net Metering Facility with Solar?

Grid Connected Rooftop Solar Power Plants are installed with net metering so that excess power generated by the solar plant which is over and above the premises load, could be fed in to the grid. In this process we achieve dual benefits by installing a solar power plant on the roof of the building firstly we are able to our own generate electricity and secondly feeding in extra electricity in to the grid. A two way bi-directional meter (in / out meter) is installed at consumer’s premises and connected with Grid’s main supply to register import and export of electricity.

Net Metering Facility with Solar

Net Metering Facility with Solar

Who can install Net Metering Facility with Solar?

All consumers of electricity in the area of supply of the DISCOM Utility can participate in the Net Metering facility with Solar subject to target capacity and on first-come-first-served basis.  Under Net Metering policy, all consumers of electricity having minimum sanctioned load of at least 1 KW and who wish to generate their own electricity by installing grid connected rooftop solar power plants on Roof-Tops/ Open area of individual households, industries, commercial establishment, training or education institutions, residential complexes, schools, colleges, hospitals, sheds, cold stores, govt. and semi-govt. buildings, etc may participate.

Net Metering Facility with Solar

Net Metering Facility with Solar

Limitations for Net Metering Facility with Solar

The maximum rooftop solar system capacity to be installed at any eligible consumer premises shall not exceed his connected load in case of Low Tension connection and contract demand in case of High Tension connection.

Arrangements for Net Metering Facility with Solar

The cost of Net meter shall be borne by the eligible consumer. Net Meter shall be installed and maintained by the DISCOM Utility. No meter rentals shall be charged from the consumer

Installed Range of Net Metering Facility with Solar

As per Haryana’s Net Metering Policy, Solar PV power projects of capacity ranging from 1 KW to 500 KW can be installed with Solar Subsidy.

Why to use Net Metering Facility with Solar

  • Reduction in bill up to 90%
  • Environment friendly, clean energy.
  • Generate your own electricity on your rooftop for you electricity requirements.
  • Reduction in electricity consumption from the grid.
  • If exported power is more than the consumed power then it would be accounted and and available for user’s consumption for one financial year. However, at the end of financial year the accumulated units would get lapsed.
  • MNRE, GOI subsidy through State Nodal Agency like HAREDA
  • Under the scheme MNRE, Government of India provides 30% subsidy for installation of solar power plants of capacity ranging from 1 KW to 500 Kw

Calculations for Net Metering Facility with 1kW Solar

At least 110 Square feet shadow free empty space is required for installation whose cost would be Rs.65,000. This would also be eligible for 30% Government Subsidy which would be equivalent to Rs.19,500, hence beneficiary’s 70% share would amount to Rs. 45,500. The cost of Net Meter would be borne by the consumer which is over and above the price listed here.

Procedure and guidelines for Installation of Net Meter in Haryana

1. The eligible consumer shall make an application in the prescribed form to the SDO (OP) of the area, along with application processing fee of Rupees 1000 for seeking permission for installation of rooftop solar system in his premises under net metering arrangement.
2. An acknowledgement in lieu of receipt of application is to be given to the consumer on the same day by S/Division office.
3. Site Verification is carried out by the SDO (OP) concerned within three days of receipt of application for net metering.
4. Permission and approval to install rooftop solar power under net metering arrangements given within 15 days of the application
5 Signing of Agreement is done between consumer and SDO (OP) Concerned within three days of approval of application.
6. Consumer is to install grid connected rooftop solar power plant at his premises within the given time frame as per guidelines issued by DISCOM / SNC / MNRE
7. In case of non-availability of Meter with DISCOM, the user will procure the meter from authorized and empaneled vendors.
8. Accepting Net meter by SDO OP concerned from the consumer for testing and verification.
9. Testing and verification of net meter to be carried out by the SDO (OP) concerned within 3 days of receipt from consumer

Mandatory installation of solar power plants with net metering

State Government of Haryana vide its notification dated 03.09.2014 has mandated installation of solar power plant for categories

• All residential buildings built on a plot size of 500 Square Yards and above
• All government and private Educational Institutes, Schools, Colleges, Hostels, Technical/Vocational Education Institutes, Universities, Offices, private Hospitals and Nursing Homes,
• Industrial Establishments, Commercial Establishments, Malls, Hotels, Motels, Banquet Halls and Tourism Complexes,
• All new Housing Complexes, developed by Group Housing Societies, Builders, Housing Boards, on a plot size of 0.5 Acre and above and
• All water lifting stations of Irrigation Department.
• In the residential sector, its mandatory for the new residential buildings whereas the installation of the rooftop solar power plants in the existing residential buildings shall be promoted by providing financial incentives.

Expert Company for Net Metering Facility with Solar

Consider selecting and approaching thoroughly professional and skilled team of DayRise Solar Enerdy Pvt Ltd for assessing and analyzing your electrical load for installation of Net Metering Facility with Solar at your home, office, mall, school or industry.

Contact DayRise Solar for Net Metering Facility with Solar

Contact DayRise Solar team every time you need to know the way to get good offers while you plan to install Net Metering Facility with Solar or buy solar panels in Sonipat.

Avail Solar Subsidy in India for Net Metering Facility with Solar

Also to get help and full Procedure to Avail Solar Subsidy in India for Net Metering Facility with Solar, you may like to contact extremely skilled and expert group of DayRise Solar by way of its Website’s contact Page or by email alternately for any question related to Solar Energy, Solar Subsidy, Solar power, solar products, design, installation and commissioning of On-Grid / Off-Grid Rooftop / Ground Mounted Solar Power Plants throughout Haryana and Delhi NCR.

Help and Assistance for Net Metering Facility with Solar

Qualified skilled team of DayRise Solar might help you in processing of subsidy documents, Net Metering Facility with Solar and processing / uploading of all related documents to Subsidy Regulation Authority / DISCOM Utility.


-- Download Net Metering Facility with Solar as PDF --


Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant

Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant

Before discussing Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant, we certainly have to learn and understand What is Grid Connected Rooftop Solar Power Plant or On-Grid Rooftop Solar Power Plant?

What is Grid Connected Rooftop Solar Power Plant

In a Roftop Solar System, the solar panels are installed on the roof of any residential, commercial, institutional and industrial buildings. Grid Connected Rooftop Solar Power Plant can be of two types:-

(i) Off-Grid Rooftop Solar Power Plant System with storage facility using battery, and
(ii) On-Grid Rooftop Solar Power Plant System i.e. Grid Connected Rooftop Solar System with Net metering facilities without Batteries.

Since we are discussing about Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant, hence our main focus would be to discuss Grid Connected Rooftop Solar Power Plant. On-Grid Solar systems generate power during the day time equivalent to the sanctioned load of the consumer which is utilized fully by powering captive loads and excess power is fed in to the grid as long as grid is available. In case, where solar power is not sufficient due to climatic conditions, cloud cover etc., the captive loads are served by drawing power from the grid through Net Meter (Bi-directional).

Working of Grid Connected Rooftop Solar System

The On-Grid Rooftop Solar Power Plant System i.e. Grid Connected Rooftop Solar System can work on net metering basis wherein the beneficiary pays to the utility on net meter reading basis only. Normally a Net meter contains two meters i.e. Export and Import meter which reflects user’s total energy usage. Such power plants can be installed at the roofs of residential and commercial complex, housing societies, community centers, government organizations, private institutions etc. Ideally, On-Grid Rooftop Solar Power Plant System i.e. Grid Connected Rooftop Solar System do not require battery back-up as grid acts as the back-up for feeding excess solar power and vice-versa. However, to enhance the performance reliability of the overall systems, a minimum battery backup of one hour of load capacity as stand alone system may be installed or existing battery inverter system could also be utilised by the user in case of non-availability of Grid and Solar. In grid interactive systems, it is ensured that in case the grid fails, the feeding of solar power to the grid is stopped immediately so as to safe-guard any grid person/technician from getting shock (electrocuted) while working on the grid for maintenance etc. This feature is termed as ‘Islanding Protection’. Simply it may be understood that in the event of failure of Grid main electricity, the solar power plant would also get shut down for safety and security measures. In such case, the user may utilise his stand alone offgrid system (existing inverter battery) for running his / her load.

Availability of Finance / Loan

Availability of Finance / Loan and Procedure to Set up Grid Connected Rooftop Solar Power Plant
Government of India Department of Financial services has instructed to all Public Sector Banks to encourage home loan/ home improvement loan seekers to install rooftop solar PV plants and include cost of system in their home loan proposals. In compliance, so far, nine PSBs namely Bank of India, Syndicate Bank, State Bank of India, Dena Bank , Central Bank of India, Punjab National Bank, Allahabad Bank, Indian Bank and Indian Overseas Bank have taken actions and issued the necessary instructions for their branches to extend loan for Grid Interactive Rooftop Solar PV Plants as home loan/ home improvement loan. The person interested in installation of Grid-Interactive Rooftop Solar PV Plants and seeking loan may approach these nearest Public Sector Banks.

Eligibility and Procedure to Avail Solar Subsidy in Haryana

Eligibility and Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant. The consumers / users of following categories are eligible for Solar Subsidy in Haryana:-

  1. Residential All types of residential Buildings

  2. Institutional Schools, Health Institutions including Medical Colleges & Hospitals,Universities, Educational Institutions etc. including those registered underthe Society Registration Act 1860 and the Indian Trust Act 1882

  3. Social Sector Community Centres, Welfare Homes, Old Age Homes, Orphanages, common service centres, common workshops for artisans & craftsman, facilities for use of community, Trust/ NGOs/ Voluntary Organisations/ Training Institutions, any other establishments for common public use etc.including those egistered under the Society Registration Act 1860 and the Indian Trust Act 1882

Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant

So far now, we have already discussed the central topic in broad. Now we have to ponder upon the real issue of today’s topic i.e. Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant. The Government is providing Financial Assistance for the installation of Grid Connected Rooftop Solar Power Plants at rate of 30% of the benchmark cost (including the Central Financial Assistance (CFA) of MNRE, if available) or Rupees 20000/- per kilowatt, whichever is less, for installation of the power plant ranging from 1 kWp to 500 kWp to the users of all eligible categories of users. The Government benchmark cost ranges from Rupees 60 to 65 thousand per kilowatt as per the size of solar power plant.

All eligible users may apply online on the portal www.hareda.gov.in of the New & Renewable Energy Department for installation of the Grid Connected Rooftop Solar Power Plant at their premises. After sanctioning of the project by Addl.Deputy Commissioner & Chief Project Officer of concerned District, the applicant may get the system installed from any Company or a body incorporated in India under the Companies Act, 1956 or 2013. The Company or the body should have valid GST registration certificate. The system shall strictly meet out the minimum technical specifications prescribed by MNRE/DNRE from time to time. Only MNRE approved components shall be used in the plant.

After completion of the project the user is required to submit the project completion report online and upload relevant document. The Project Officer / APO/TA shall verify the commissioning of the system and technical specifications of the system and issue provisional commissioning certificate for the purpose of installation of Bi-Directional meter and after installation of the Bi-directional Meter Joint Commissioning Report shall be issued on verifying the commissioning of the system, performance of the system and technical specifications of the system. On recommendation of the project & uploading the final JCR, the Additional Deputy Commissioner-cum-Chief Project Officer of respective district shall sanction the release of subsidy. Thereafter the subsidy shall be released through NEFT/RTGS in the account of the user.

Summary

  • Grid-Tied rooftop solar plants are installed in such areas where grid electricity is available for almost 24 hours a day to enable excess electricity exporting to the Grid through Net Meter.
  • These systems are eligible for Govt Subsidy for Residence, Institutions and NGOs to the tunes of Rupees 20,000 per kW or 30% of the project, whichever is less.
  • No batteries are installed in these kind of system, the Grid acts as the storage.
  • The plant will not work in the absence of Grid for safety measures.
  • This would enable users to cut their electric bills up to 90% for almost 25 years.
  • Users may avail 30% Subsidy on Solar Power Electricity Panels by getting On-grid Rooftop Solar System installed at their empty roof space.
  • One Kwp on-grid rooftop solar power plant may generate 4 to 5 units per day subject to clear day light and availability of Grid. Solar PV modules may perform at least 25% of its warranted capacity even on cloudy days. Solar PV Modules are warranted to perform 80 to 90% for 25 years i.e 90% for first 10 years and 80% for remaining 15 years.
  • One kWp solar plant may help you to reduce your electric bill up to Rupees 1000 per month for 300 clear sunny days in India.
  • Installation of One kWp Solar Power plant would require 110 Square Foot (11 Square meters) shadow free empty roof space.
  • On-Grid solar power plant equivalent to Sanctioned Load (SL) of your electric meter ranging from 1 to 500 kWp may be installed after obtaining prior sanction from State Nodal Agency of particular state Government.
  • On-Grid Solar plant is comprised of Solar Panels, Mounting Structure, Connectors, DC Wire, On-Grid String Inverter, AJB, DJB, SPD, Earthing and Lightening Arresters along with other BOS (Balance of System).
  • On-Grid Solar Plant also includes mandatory 5 Years Annual Maintenance Contract (AMC) as per guidelines given by MNRE, Govt of India other than the individual guaranties / warranties of various products / components.

Contact Highly Professional and Skilled Team of DayRise Solar

To get assistance and full Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant, you may like to contact highly professional and skilled team of DayRise Solar through its Website contact Page DayRise Solar Enerdy Pvt Ltd or by following email addresses alternately for any query related to Solar Energy, Solar Subsidy, Solar power, solar products, design, installation and commissioning of On-Grid / Off-Grid Rooftop / Ground Mounted Solar Power Plants across Haryana and Delhi NCR. Qualified professional of DayRise Solar may assist the users in processing of subsidy application, bi-directional meter application and uploading of all relevant documents.

Email
info@dayrisesolar.com
contact@dayrisesolar.com
vipin@dayrisesolar.com
anand@dayrisesolar.com

Telephone / Mobile / Whatsapp
+ 91 9963493474
+ 91 9618637662

While team of DayRise Solar is not far away from a telephonic call, they could also be reached through Whatsapp at provided Mobile Numbers. Call for following products and Services:-

  • Site Visit and Load Assessment
  • Processing of Subsidy
  • Documentation
  • Assistance in Getting Sanction for Subsidy
  • Rooftop On-Grid Solar Power Plant with Subsidy
  • Rooftop Hybrid Solar Power Plant with Subsidy
  • Rooftop Off-Grid Solar Plant without Subsidy

Address

DayRise Solar Enerdy Pvt Ltd, Mama Bhanja Chowk, Delhi Road, Sonipat, Haryana, India, PIN-131001

Though DayRise Solar Enerdy Pvt Ltd is established at Mama Bhanja Chowk, Delhi Road, Sonipat, Haryana and primarily located in the electrical market of the region. Very easy to reach from Main Bus Stand as well as Nearest Railway Station. Parking facility for the commuters is available nearby at and surroundings of Sonipat Main Bus Stand.

Thanks for reading this Article. Please like, share and Subscribe to our feed / RSS and get notified for next article concerning Solar Energy System.

Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant

Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant


-- Download Procedure to Avail Solar Subsidy in Haryana for Grid Connected Rooftop Solar Power Plant as PDF --


How Much Does Solar Power Cost – Solar Power

How Much Does Solar Power Cost - Solar Power

How Much Does Solar Power Cost – Solar Power

How Much Does Solar Power Cost – Solar Power

When considering altering your properties energy offer to solar energy, worth is commonly the first concern. You could be questioning How Much Does Solar Power Cost – Solar Power. I’ve damaged down a couple of the solar power price for you beneath. These are simply a number of the many makes use for solar energy.

Making your own solar and wind power for less than $200

Portable solar power units worth wherever from $120 to $1000. These are used for one thing from charging a cellphone to powering a television set

Heating your swimming pool in the middle of the summer time season costs roughly the same cost as heating your full residence for a full 12 months. To save in your heating invoice, you should use solar-powered pool covers. They worth wherever from $1700 to $4500, nonetheless the covers will pay for themselves with the money you save in your heating bill.

Solar Hot water heaters

Solar Hot water heaters preheated your water sooner than its put into your scorching water heater. By warming the water first it saves on the amount of energy used by your scorching water heater.
They’re fairly pricey, from as little as $2900 and upwards of $4000, nonetheless as quickly as soon as extra the monetary financial savings in your energy invoice shall be correctly nicely definitely worth the funding

Off Grid Solar strategies

Off Grid Solar strategies are impartial energy sources for providing energy in areas the place utilities are often not on the market. These fashions worth between $1500 and $5000 and should energy a full cabin or residence. Grid Tied Systems are strategies that are tied into your native energy provider and should cut your electrical energy bill by 80% and even 100%. Any extra electrical energy created by your system must be purchased by your electrical energy provider. With a system like this you’ll have the potential to not solely eradicate your electrical energy bill, however as well as get a look at inside the mall for the extra electrical energy you’ve gotten created as correctly. These strategies are the costliest and should worth as a lot as $20,000

All of these solar energy worth might be lowered or eradicated whilst you check to assemble your particular person residence solar panel, solar energy mills and storage models. For a fraction of the prices quoted above you should purchase guides that may data you step-by-step in developing your particular person residence solar panels and mills

Whenever you are locally searching for the the system integrator, solar energy company in your are, you may like to consider DayRise Solar Enerdy Pvt Ltd for Engineering, Procurement and Commissioning (EPC) of r ooftop solar power plants who provides quantity and quality with optimum utilization.


-- Download How Much Does Solar Power Cost - Solar Power as PDF --