Grid Connected Solar Panel Power Plant in India

Yes, I know many of us just want to know the price of “1kw Grid Connected Solar Panel Power Plant in India with Subsidy”, however, to understand issues related to price, value, subsidy and cost of installation etc. we must first understand “What is a Grid Connected Solar Panel Solar Power Plant?”

Simply we may put “a Solar Power Plant produces direct current directly from Sun by the interaction of sunlight or sun rays with a solar photo-voltaic PV Modules / solar PV panels made of semiconductor material. The electricity provided is direct current (DC) electricity. A Solar Power Plant consists of an array of solar PV modules generating DC electricity, an inverter and sometimes battery backup storage.

Further we need to understand types of Solar Power Plants. Basically we may classify the solar power plants in to two main and broad categories:-

(a) Off-Grid Solar / Stand Alone System: Standalone Off-Grid solar system with battery backup consists of solar panels, solar mounting structure, solar DC wire, solar inverter and solar batteries. Off-Grid solar system is installed in such areas where electricity from main Grid is either not available or very limited. Solar System integrator may design the off-grid system as per the requirement of user’s load and backup time required.

(b) Grid Connected / On-Grid Rooftop Solar Photo-voltaic Power Plant: It is grid connected rooftop solar power plant which is further divided in to two types

(i) Grid Connected / On-Grid Rooftop Solar Photo-voltaic Power Plant without Battery Backup is normally known as Grid Connected Rooftop Solar (GCRT). Grid Connected Solar Panel Power Plant in India without battery backup consists of solar panels, solar mounting structure, solar DC wire, solar inverter and other Solar BOS including Net meter. Grid Connected Rooftop Solar / On-Grid rooftop solar system is installed in such areas where electricity from main Grid is available almost 24 hours hence does not require battery backup. Solar System integrator may design the Grid connected rooftop solar power plant as per the requirement of user’s load in terms of electrical units required every day. 1kw Grid Connected Solar Panel Power Plant in India is sufficient to produce 4 to 5 units per day for 300 clear sunlight days. The “grid-connected” Solar Power Plant may connect to the grid power by installing bi-directional Net meter with the permission of power utilities under “Net Metering” regulations of the State.

(ii) Grid Connected Hybrid Rooftop Solar Photo-voltaic Power Plant with Battery Backup normally known as Hybrid Solar which acts as “Grid Connected Rooftop Solar” (GCRT) in case of availability of main grid and “off-grid” when electricity from main grid is not available. Hybrid rooftop solar power plant with battery backup consists of solar panels, solar mounting structure, solar DC wire, solar string inverter and other Solar BOS including Net meter and solar batteries. Hybrid Grid Connected Solar Panel Power Plant in India is installed in such areas where electricity from main Grid is available at least 18 to 20 hours and user needs 4 to 6 hours battery backup. Solar System integrator may design the Hybrid Grid connected rooftop solar power plant as per the requirement of user’s load in terms of electrical units required every day and battery backup. 1kw Hybrid Grid Connected Solar Panel Power Plant in India is sufficient to produce 4 to 5 units per day for 300 clear sunlight days.

Grid Connected Solar Panel Power Plant in India with Net Meter

Grid connected rooftop Solar Power Plant can directly be connected from the Grid. The “Net Metering” allow you to feed the excess electricity to the grid when your system is generating more power than you are consuming. The power exported to the grid may be credited to your account and can be used by the consumer during one financial year. However carry forward beyond the financial year is not allowed under net metering regulations.

Solar Subsidy for 1kw Grid Connected Solar Panel Power Plant in India

Solar Power Plant ranging from 1kWp to 500 kWp may be installed under MNRE Scheme to avail solar subsidy at Rupees 20,000 per kilowatt or 30% of benchmark cost whichever is less. A grid connected Solar Power Plant can be installed in a shadow free area either in open ground or on the roof top. Central Financial Assistance (subsidy) up to 30% ( or Rupees. 20000/- per kWP, whichever is less) of the benchmark cost of the system may be provided, as per the prescribed eligibility criteria from time to time on pre sanctioned cases and as per availability of funds from time to time. However, commercial and industrial establishment of private sectors are not eligible for the subsidy.

How to get Solar Subsidy for Grid Connected Solar Panel Power Plant in India

In case of State of Haryana, the subsidy may be provided through the Renewable Energy Department / HAREDA for which the consumer shall make an online application at HAREDA Online portal before installation of grid connected rooftop solar power plant. Prior sanction of MNRE / Renewable Energy Department / HAREDA for each plant is required.

Space for installation of 1kw Grid Connected Solar Panel Power Plant in India

For installation of 1kw grid connected solar panel power plant in India you may require 10 square meter shadow free area. On clear broad day light a grid connected rooftop Solar Power Plant can generate electricity for 6 to 8 hours daily.

If Grid Connected Solar Panel Power Plant sufficient to run all devices

Grid connected solar panel power plant in India is sufficient to operate any electric operated devices / gadgets, however heavy load are not advisable to operate from a small capacity Solar Power Plant with battery backup.

Electricity generated by 1kw Grid Connected Solar Panel Power Plant in India

A South facing 1kw grid connected solar panel power plant in India will generate around 1200 to 1500 units per year. Grid Connected Rooftop Solar Power Plant may reduce your electrical bill up to 90% for next 25 years.

Does a Grid Connected Rooftop solar plant stop working in case of non-availability of grid?

Yes, In case of non-availability of main grid (electricity), grid-connected rooftop solar power plant would also stop working. Electric power may be available from the conventional inverter and battery if installed at your premises. However, in case of Hybrid grid connected rooftop solar power plant, your load will remain operational from already existing battery bank which is installed as part of Hybrid Solar Power Plant. Solar Power Plant with battery bank will work even when grid power (Electricity Supply) is not available but the power from solar power plant cannot be exported to grid in absence of grid power. However, the Solar Power Plant without battery bank will not work or give the power in absence of grid power (Electricity Supply).Existing conventional inverter can be attached with the grid connected rooftop Solar Power Plant for captive use as in the case of normal grid power.

Who can install Grid Connected Solar Panel Power Plant in India?

The user / applicant may install the Solar Photo-voltaic Power Plants system from any Company or a body incorporated in India under the Companies Act, 1956 or 2013 including any amendment there to or proprietary / partnership firm. The company or the body must be registered for business associate in solar sector. A copy of certificate of incorporation along with AOA / MOA shall be furnished with the Project Completion Report. The Company or the body should have not been debarred / blacklisted by any Government Departments / organization/ PSU’s / institutions/ agencies / autonomous Organizations / Ministry of Corporate Affairs. The Company or the body should have a valid GST registration certificate.

Cost of 1kw Grid Connected Solar Panel Power Plant in India with subsidy

1 to 5kWp Grid Connected Rooftop Solar Power Plant without battery bank may be installed at the rate of Rupees. 60 to 88 per watt while that of with battery bank it may be Rupees 110 per watt for 3kWp, the cost depends on the type and capacity of battery bank. System prices would reduce as the capacity of the system increase.

AMC / Warranty / Guarantee for 1kw Grid Connected Solar Panel Power Plant in India
Solar vendor / system integrator / Solar EPC Companies provide 5 years AMC / Warranty / Guarantee for the complete grid connected rooftop Solar Power Plant while solar panels generally carries 25 years performance warranty from manufacturer for 80% power output as per the MNRE guidelines.

Net metering facility for Grid Connected Solar Panel Power Plant in India

In grid connected rooftop solar power plants with net-metering facility, surplus power over and above the premises load, if any, can be fed into the grid through a Bi-Directional Net meter. In case of off grid system the surplus power after charging battery bank fully remains wasted. Surplus electricity generated from a grid connected rooftop Solar Power Plant fed in the grid can be adjusted / utilized within one financial year.

Safety of Grid Connected Solar Panel Power Plant in India

Grid connected rooftop solar power plant are safe from wind for a wind velocity up to 150 KM per hour and also safe from hailstorms to a great extent, if installed properly, as per technical specifications and guidelines laid down by MNRE / HAREDA.

Grid Connected Solar Panel Power Plant in India

Grid Connected Solar Panel Power Plant in India


-- Download Grid Connected Solar Panel Power Plant in India as PDF --


Grid Connected Rooftop Solar power Plant

Grid Connected Rooftop Solar power Plant Installation is the new found technology to reduce electric bills up to 90% for next 25 years minimum.  Government of India, Ministry of New and Renewable Energy (MNRE) through Jawahar Lal Nehru National Solar Mission (JNNSM) provides solar subsidy and other incentives to motivate people to go green go solar.

Solar power is by far the Earth’s most available energy supply, simply able to offering many times the total current energy demand.  It is sufficient to supply all of the world’s electricity, by installing solar panels covering 4% of the world’s desert area.

Solar power is a predictably intermittent energy source, meaning that whilst solar power is not available at all times, we can find out with high proficiency and accuracy when it will and wont be available.

Solar power is the conversion of sunlight into electricity. Sunlight may be transformed instantly directly into electricity utilising photovoltaics (PV), or indirectly with concentrating solar power (CSP), which normally focuses the solar’s energy to boil water. Photovoltaics have been initially used to power small and medium-sized functions, from the calculator powered by a single solar cell to off-grid houses powered by a photovoltaic array.

The solely vital downside with solar power is upfront installation cost, though solar installation price has been lowering as a result of manufacturing at large scale as well as awareness. Developing international countries have began to construct solar power plants, changing other sources of energy technology.

Since solar power is intermittent, it should be mixed both with storage or other energy sources to provide steady power, though for residential users, institutions and industries, provision of net metering makes this clear to the patron.

One elementary distinction between renewable energy and non-renewable energy is that non-renewable assets may be bought as they’re consumed, whereas with renewable assets, you pay upfront cost for the subsequent twenty five years or so of energy.

What is a Grid Connected Rooftop Solar power Plant?

In Grid Connected Rooftop Solar power Plant, the DC power produced from Solar photovoltaic panel is transformed in to AC power using Solar Inverter / Power Conditioning Unit (PCU) / (String Inverter and it is provided to the load of the user.  Excess power if any, is fed to the main Grid of 220kv / 66kv/ 33kV/ 11kV three phase lines or of 440/ 220Volt three/ single phase line depending on the capacity of the system installed at residence / schools / colleges / institution/ commercial establishment or residential complex. These Grid Connected Rooftop Solar Power Plant (SPV) systems produce electricity during the day time which is consumed fully by powering captives loads and feed excess power to the grid as long as grid is available. In case, where solar power is not sufficient due to cloud cover etc. the captive loads are powered by drawing power from the main grid.

Where Grid Connected Rooftop Solar Power Plant installed?

Grid Connected Rooftop Solar Power Plant can be installed at the rooftops of residential and commercial complex housing societies, community’s centers, Government organization private institution etc.

How much roof area is required to set up Grid Connected Rooftop Solar Power Plant?

About 10-11 Square Meter or 110 Square Foot area is required to set up 1 KWp Grid Connected Rooftop Solar Power Plant.

What are advantages of installing Grid Connected Rooftop Solar Power Plant?

  • It may reduce your electricity bill up to 90%.
  • By Installing Solar PV System you contribute greatly towards eco-friendly protection.
  • User produces power according to his / her requirement.
  • Surplus power if any can be fed in to the Grid.
  • Reduction in monthly electric bill, as it is prepared as per net meter readings.
  • MNRE, GOI provides 30% subsidy on installation of Grid Connected Rooftop Solar Power Plant in Institution, domestic sector and non-profit making NGOs / institutions.
  • Fast Return of Investment after availing Solar Generation Incentive (SGI) / Generation Based Incentive (GBI).

What is Net Metering in context to Grid Connected Rooftop Solar Power Plant?

In net-metering, the excess solar energy if any is exported to the grid. The same excess solar energy exported during day time is deducted from the energy imported from the main grid during night time. The user pays for the net-energy imported from the grid.

MNRE Solar Subsidy for installing Grid Connected Rooftop Solar Power Plants?

Yes, Central Financial Assistance (CFA) of 30 % of the bench mark cost or Rupees Twenty Thousand whichever is less is provided for 1 KWp up to 500 KWp Grid Connected Solar Power Plants to Residential Consumers (irrespective of the electricity connection) for installing Grid Connected Rooftop Solar Power Plants.

MNRE Solar Subsidy for institutional (Hospitals, Schools etc.) / Social Sector

Yes, Central Financial Assistance (CFA) of 30 % of the bench mark cost or Rupees Twenty Thousand whichever is less is provided for 1 KWp up to 500 KWp Grid Connected Solar Power Plants to institutional (Hospitals ,Schools etc ) / Social Sector (irrespective of the electricity connection) for installing Grid Connected Rooftop Solar PV Power Plants.

Requirements for installing Grid Connected Rooftop Solar Power Plants?

  • About 10-11 Square Meter or 110 Square Foot area is required to set up 1 KWp Grid Connected Rooftop Solar Power Plant.
  • The User shall have Three Phase/ Single Phase electric supply service connection.
  • Paid Electricity Bill
  • User must be AADHAAR Card holder
  • User must be PAN Card holder
  • User must have a bank account
  • User must have a valid email address and mobile number for communication.
  • Any proof of Photo ID / Residence proof.
  • Grid Connected Rooftop Solar Power Plants is installed with mandatory safety precautions / features as per the norms set by MNRE.
  • Necessary Installation of Bi-directional meter for export and import of energy.
  • The standard equipment including solar panels, solar mounting structure, solar DC wire, connectors, on-grid string inverter, array junction box, distribution junction box, and surge protection device, earthing and lightening arresters as per the norms of MNRE shall only be installed.
What is CAPEX  RESCO model  for installation of Grid Connected Rooftop Solar Power Plants?

In the CAPEX business model, installation of Grid Connected Rooftop Solar Power Plant is installed, owned and maintained by the user by investing upfront cost.  On the other hand in RESCO Business model, the expenditure and maintenance of the plant is born by the RESCO 3rd party company.

Which business model is best for installation of Grid Connected Rooftop Solar Power Plant?

CAPEX model is always better for consumers that have adequate funds for installation.  Consumers may avail benefit of net metering and solar subsidy .

From where I can install the Grid Connected Rooftop Solar Power Plant?

Any solar firm / company whose AOA / MOA contains nature of business as “to conduct or carry out solar energy activities as per their registration documents” are empowered to install Grid Connected Rooftop Solar Power Plant in Haryana.  Firms /vendors empanelled with IPGCL only can install Grid Connected Rooftop Solar Power Plant in Delhi.

What is the process of availing 30 % Central Financial Assistance (CFA) from MNRE?

You may directly apply for solar subsidy online through HAREDA’s portal in Haryana or may like to take help / assistance of any solar vendor who are proficient to carry out the business of installation of Grid Connected Rooftop Solar Power Plant.  Whereas in Delhi, the empanelled  vendors may be approached for availing upfront subsidy for installation of Grid Connected Rooftop Solar Power Plants

What is Solar Generation Incentive (SGI) / Generation Based Incentive (GBI)?

SGI / GBI is an incentive linked with Generation of Solar Power from the Grid Connected Rooftop Solar Power Plants is being provided by State Government of Haryana and Delhi respectively.

What is the annual energy generated from a 1 kWp Grid Connected Rooftop Solar Power Plant?

A 1 KW Grid Connected Rooftop Solar Power Plant is considered to generate electric units ranging from 1200 to 1500 units per annum as per sunlight conditions.

Consider selecting and approaching thoroughly professional and skilled team of DayRise Solar Enerdy Pvt Ltd for assessing and analyzing you electrical load for installation of Solar Energy Solar Panel Power Plant System at your home, office, mall, school or industry.

Contact DayRise Solar for Installation of Grid Connected Rooftop Solar Power Plants

Contact DayRise Solar team every time you need to know the way to get good offers while you plan to install Solar Energy Solar Panel Power Plant System or buy solar panels in Sonipat.

Avail Solar Subsidy in India for Grid Connected Rooftop Solar Power Plant

Also to get help and full Procedure to Avail Solar Subsidy in India for Grid Connected Rooftop Solar Power Plant, it’s possible you’ll like to contact extremely skilled and expert group of DayRise Solar by way of its Website’s contact Page at DAYRISESOLAR.COM or by email alternately for any question associated to Solar Energy, Solar Subsidy, Solar power, solar products, design, installation and commissioning of On-Grid / Off-Grid Rooftop / Ground Mounted Solar Power Plants throughout Haryana and Delhi NCR.

Help and Assistance for uploading of documents for Grid Connected Rooftop solar Power Plants

Qualified skilled team of DayRise Solar might help you in processing of subsidy utility, bi-directional meter utility and processing / uploading of all related documents to Subsidy Regulation Authority / DISCOM Utility.

Grid Connected Rooftop Solar Power Plant

Grid Connected Rooftop Solar Power Plant

DayRise Solar Enerdy Pvt Ltd, B/212C, Mama Bhanja Chowk, Delhi Road, , Sonipat, Haryana 131001, India - Phone: +919963493474 Secondary phone: +919618637662 Email: anand@dayrisesolar.com URL:

Route

Your location:


-- Download Grid Connected Rooftop Solar power Plant as PDF --


MNRE Rooftop Solar Subsidy in India

Solar Energy is the next big and ambitious dream of Government of India.  The solar movement is encouraged with MNRE Rooftop Solar Subsidy in India to achieve 100 GW target by 2022.

MNRE Central Finance Assistance

Government of India through Ministry of New and Renewable Energy (MNRE) has announced a series of Central Financial Assistance (CFA) incentives, solar schemes and solar incentive to encourage solar PV in India and accomplish its highly ambitious 100 GW target by 2022. The provision of solar subsidies in India is aimed at providing subsidies to individuals or enterprises willing to contribute to the growth of new found clean green renewable energy

Government of India (MNRE) is also preparing to re-design its solar subsidy and solar incentive packages for grid connected rooftop solar power plant systems to ensure expediting execution of the 100 GW capacity by 2022 across several sections of power customers.

Schemes for Grid-connected Rooftop Solar Power Plants

CFA is 30% of the benchmark cost for general and 70% CFA for North Eastern and the Special Category States, for the residential, Social and institutional Users. It may be noted that there is no subsidy for the commercial & industrial (C&I) sector though 40% ADT and provision of net metering is still on the cards for industries.

As per the current guidelines set by MNRE, CFA (Central Finance Assistance) subsidy for Grid-Tie Solar system :

MNRE Subsidy

 MNRE Subsidy Applicable for

30% max of benchmark cost General Category States: All other States/UTs not covered under special states
70% max of benchmark cost Special Category States/Islands: North Eastern States including Sikkim, Uttarakhand,Himachal Pradesh, Jammu & Kashmir and Lakshadweep, Andaman & Nicobar Islands

Benchmark Cost for MNRE Solar Subsidy in India

Updated benchmark costs for Grid Tied / ON Grid Solar Rooftop Systems by the MNRE, for the current financial year of 2018-19 have been revised. The below prices are valid until further notice & amendments from the MNRE and applicable across India.

Rooftop capacity

Benchmark cost (Rupees/Watt)

1 to 10 kWp

60

10-100kWp

55

100-500kWp

53

Eligibility for MNRE rooftop Solar Subsidy in India

MNRE rooftop Solar Subsidy in India is provided to the customers of Residential, Institutional and Social Sector (NGO/NPO) via MNRE and state Renewable Energy Departments like HAREDA, PEDA, GEDA and UPNEDA etc.

Type

Details

Residential

All types of residential buildings, including group housing.

Institutional

Schools, health institutes including medical colleges & hospitals, universities, educational institutes, etc

Social Sector

Community centers, welfare homes, old age homes, orphanages, common service centers, common workshop for artisans or craftsman, facilities used for the community. Trusts/NGO/Voluntary organizations/ training institutes, any other establishments for common public use, etc.

Procedure to avail MNRE Solar Subsidy in India

Procedure to avail MNRE Solar Subsidy, solar incentives and solar grants has been laid down by the Government of India (MNRE) through various steps have been simplified and summarized for better understanding.

  • Step-1 Simply, users are to apply online for installation of Grid Connected Rooftop Solar Power Plant through the portal designated by State Nodal Agency (SNA).  You may like to take help of solar vendors / solar EPC Company for processing your application.
  • Step-2 SNAs (like HAREDA, PEDA, UPNEDA, GEDA, UKEDA etc) evaluates your project and redirects the same to Chief Project Officer (CPO) of your District.  Most of the time Additional Deputy Commissioner (ADC) of your District is assigned the task of CPO.
  • Step- 3 Renewable Energy Department under ADC acts as district nodal agency for pre and post installation inspections of the site and coordinates with SNA / MNRE for grant / release of MNRE solar subsidy.
  • Step-4 Upon inspection of your empty roof by the delegated Project Officer (PO) / Assistant Project Officer (APO), the formal go-ahead sanction for installation of solar plant with subsidy is granted and informed to the person by the CPO / ADC of the District concerned via registered       e-mail / SMS.
  • Step-5 Application along with fee of Rs.1000 for installation of net metering is applied to SDO (Operations) concerned of DISCOM / Utility (UHBVN / DHBVN in case of Haryana).
  • Step-6 Upon acceptance of Net metering application, the User may select an EPC Company / Solar Vendor / Solar Developer for installation of Grid Connected Rooftop Solar Power Plant. A Power Purchase Agreement (PPA) for Grid Connected solar power plant is also signed between user and DISCOM utility.
  • Step-7 Place an order with reputed and established EPC Company / Solar Vendor of your area after thorough search and proven track record in past.
  • Step-8 You will be responsible for payment of 100% of the system cost, if you chose to finance your solar plant, you may work with you bank to procure financing 70% of the system cost. All nationalized bank are to provide loan for installation of Grid Connected Rooftop Solar under home loan category.
  • Step-9 CPO/PO/APO/SNA inspects your installation to ensure that only MNRE approved components are installed and issues a Provisional Commissioning Report (PCR).
  • Step-10 30% Subsidy of Benchmark cost is released to the beneficiary’s bank account directly without waiting for installation of net metering or any other process.
  • Step-11 You will be responsible for payment of 70% of the system cost, if you chose to finance your solar plant, you may work with you bank to procure financing 70% of the system cost.
  • Step-12 CPO/PO/APO/SNA along with SDO (DISCOM Utility) and representative of solar developer inspects your installation after installation of net meter to ensure that plant is connected to the Grid and declared as Operational.  Accordingly a Final Commissioning Report (FCR) is signed by all three stake holders.
  • Step-13 FCR, Certificates, guaranty, warranty, undertaking etc. are uploaded to the SNA Portal as a final step.

Frequently Asked Question about MNRE Solar Subsidy in India

Though, all questions related to MNRE Rooftop Solar Subsidy in India have been answered through this article.  However few of Frequently Asked Questions (FAQ) are also covered here to further enhance the knowledge.

FAQ 1 : How do we avail MNRE Rooftop Solar Subsidy in India?

Ans : You may apply to your state nodal agency through designated online portal for Grid Connected Rooftop solar power plants ranging from 1 to 500 kWp.

FAQ 2 : Who are eligible to avail MNRE Rooftop Solar Subsidy in India

Ans :  Users of Residential, Institutional and Social sectors are eligible to avail 30% amount of benchmark cost in the form of solar subsidy through SNA and District Renewable Energy departments.

FAQ 3 : If Govt solar energy scheme or MNRE Rooftop Solar Subsidy in India is applicable to industries and commercial users

Ans : MNRE Rooftop Solar Subsidy in India is not extended to Commercial users and industries.

FAQ 4 : Where can we find MNRE solar subsidy application form

Ans : The whole procedure right from application is provisioned through online portals designated by State Nodal Agencies like HAREDA in Haryana.

FAQ 5 : What is the maximum benefits of Indian Government Solar Panel Schemes

Ans : Eligible Users may avail Rs.20,000/- per kWp or 30% of benchmark cost of whole project in the form of MNRE Rooftop Solar Subsidy in India.

FAQ 6 : If there is any solar rooftop calculator?

Ans : Yes Government of India through ARUN application has launched solar rooftop calculator for availing MNRE Rooftop Solar Subsidy in India.

FAQ 7 : What is cost of 1 kW solar panel price in India with MNRE Solar subsidy

Ans : 1 kw solar panel price is very high as upfront cost.  Solar Vendors may install starting from Rs. to Rs.88 per Watt.

FAQ 7 : What is cost of 2 kW solar panel price in India with Govt Solar subsidy

Ans : 2 kw solar panel price is reasonably priced as upfront cost.  Solar Vendors may install such plants starting from Rs.65 to Rs.68 per Watt.

FAQ 7 : What is cost of 3 kW solar panel price in India with subsidy

Ans : A 3 kw solar panel price may range between Rs.64 per watt to Rs.65 Watt.

FAQ 7 : What is cost of 5 kW solar panel price in India with subsidy

Ans : A 5 kw solar panel price in India may range between Rs.59 per watt to Rs.60 per Watt as per phase i.e. single or three-phase meter connection.

FAQ 7 : What is cost of 10 kW solar panel price in India with subsidy

Ans : A 10 kw solar panel price in India may range between Rs.58 per watt to Rs.59 per Watt as per phase i.e. single or three-phase meter connection.

FAQ 8 : If Solar Panels are provided free of cost by Govt of India

Ans : Nothing is free in the world. Please do not be misguided by misleading information prevalent on social media. These are total gimmicks only to extract your personal and valuable information through false links. MNRE, Government of India has already clarified this through a circular for people.

Important Note for Availing MNRE Solar Subsidy in India

Note : All the prices are approximate as per market research as on date.  Seek current rates through a proper quotation for installation of plants with MNRE Rooftop Solar Subsidy in India.  You may like to contact and consider selecting and approaching thoroughly professional and skilled team of Day Rise Solar Enerdy Private Limited for assessing and analyzing your electrical load to Install Solar Panels with MNRE Rooftop Solar Subsidy in India at your home, office, mall, school or industry.

Get Help and Procedure to Install Panels with MNRE Solar Subsidy in India

Get help, support and full Procedure to Install Solar Panels With MNRE Rooftop Solar Subsidy in India for Grid Connected Rooftop Solar Power Plant or any question associated to Solar Energy, Solar Subsidy, Solar Power, Solar Products, Design, Installation and Commissioning of On-Grid / Off-Grid Rooftop / Ground Mounted Solar Power Plants across Haryana and Delhi NCR. Qualified skilled team of Day Rise Solar might help you in processing of application for solar subsidy, bi-directional Net meter utility & uploading of all documents to SNA’s Website.

MNRE Rooftop Solar Subsidy in India

MNRE Rooftop Solar Subsidy in India

 


-- Download MNRE Rooftop Solar Subsidy in India as PDF --